04050
may
2004 /EEND OP EEND /dordrecht
educative
and protecion wall for ducks in a nature parc
construction material are re-used wooden harbour poles of 8m length,
cut into blocks and built up with lego-like system, reinforced by metal bolts.
in
cooperation with anke wijnja, stefan de graaf













